Experienced Project Manager and Engineer, with a chemical process engineering background managing complex project teams in EPC (Engineering, Procurement and Construction), commissioning, start-up and operation stages. Project team leadership and a multidiscipline engineer; drafting teams, providing direction and coaching.
- Liquid H2S; Handling, storage and vaporization.
 - Heavy oil upgrading.
 - Heavy oil dewatering and desalting.
 - Oil and gas pipelines
 - Gas treatment processes.
 - Produced water treatment.
 - Ammonia production.
 - Ethane recovery.
 - Heavy oil upgrading.
 - Well pads conditioning
 - Well flowlines.
 - Surface facilities.
 - SAGD (Steam-assisted gravity drainage).
 - Oil battery design and operation.
 - Steam generation.
 - Oil and gas pipelines.
 - Gas treatment processes.
 - Plant commissioning and start-up.
 - Produced water treatment.
 
Focused Areas
- Process design, process engineering, project engineering and project management.
 - Plant operations and environmental issues.
 - Accountability: Safety in design, time and cost management.
 - Cooling tower operation and design.
 - Hydrogen production and purification.
 - Nitrogen production and purification.
 - Process, mechanical, piping, electrical, Instruments and controls.
 - Civil, procurement, purchasing, expediting, and inspection management.
 - Cost control, cost estimation, and scheduling
 - Project communications and coordination.
 - Coordination of engineering project team, and client liaison.
 
Experience
E.R. P.& E. Owner, 2009 - Present
- Define company goals and strategies.
 - Conduct business development.
 - Manage engineering disciplines.
 - Manage document controls.
 - Manage regulatory and permits.
 - Liaison with client.
 
Talis Engineering Inc, Calgary, AB, Canada, Project Manager, 2016 - 2017
- Manage engineering disciplines.
 - Manage document controls.
 - Manage regulatory and permits.
 - Conduct engineering reviews.
 - Schedules and cost estimates preparation.
 - Liaison with client.
 
TR Canada Inc. Calgary, AB, Canada Engineering Manager, 2012 - 2016
- Manage engineering disciplines.
 - Manage document controls.
 - Manage regulatory and permits.
 - Conduct engineering reviews.
 - Schedules and cost estimates preparation.
 - Coordinating project engineering teams in Spain.
 - Liaison with client.
 
Projex. Calgary, AB, Canada, Senior Project Engineer, 2012
- Executed oil and gas engineering projects and coordination and management.
 - Lead engineering reviews.
 - Equipment, Instruments, controls requisitions and bid evaluation.
 - Manpower planning.
 - Schedules and cost estimates preparation.
 
IMV Projects. Calgary, AB, Canada, 2007 – 2012,
Project Engineer, 2010 - 2012
Oil and Gas Engineering Projects-Coordination and Management
- Lead engineering reviews.
 - Equipment, instruments and controls requisitions and bid evaluation.
 - Manpower planning.
 - Liaison with client.
 - Coordinate conceptual design work.
 - Prepare deliverables packages.
 
Project Engineer, 2007 - 2009
- Lead engineering reviews.
 - Manpower planning.
 - Disciplines coordination.
 - Liaison to client.
 
ConocoPhillips Canada Surmont-1 Project
- Security system design.
 - Artificial lift upgrade.
 - Pilot plant blowdown tank replacement.
 
Nexen Long Lake Project
- Well pad electrical heat tracing inventory.
 - HLS coagulant, flocculant injection skid.
 - LP steam condensate conductivity control.
 - De-oiling coagulant retrofit.
 
Suncor Sustainable Projects
- Upgrade drains and sumps.
 - Secondary tank containment.
 - Hazardous materials building.
 - Permanent H2 O2 System.
 
Suncor Major Projects
- Firebag additional OTSG.
 
Worley Parsons. Milan Operating Center. Milan, Italy, 2004 - 2010
Senior Area Project Engineer, 2009 - 2010
Oil and Gas Engineering Projects-Coordination and Management
- Lead engineering reviews.
 - Equipment, instruments and controls requisitions and bid evaluation.
 - Manpower planning.
 - Schedules and cost estimates preparation.
 
Project Engineer, 2004 - 2006
NEXEN Inc. Long Lake BFW Treatment Plant Upgrading
- Schedule and budget preparation.
 - Equipment evaluation.
 - Execution Plan preparation.
 - Equipment and instruments bids evaluation.
 
Sherritt International Canasí Salt Water Ocean Disposal (Cuba)
- Equipment evaluation.
 - Execution plan preparation.
 - Equipment and instruments bids evaluation.
 - Disciplines coordination.
 
Husky Marvin Battery project
- Data books preparation.
 - Engineering data book completion.
 - Project close-out.
 
Husky Marwayne Battery project
- Data books preparation.
 - Disciplines Coordination
 - Project close-out.
 
Husky Slop Oil Treatment Plant
- AFE preparation.
 
EnCana Corporation Saline Water Treatment Plant
- Pilot plant stage project management.
 - Commercial plant project management.
 - Technical solutions evaluation.
 - Environmental permits preparation and request.
 
Suncor Firebag Project
- Cost estimation.
 - Equipment evaluation.
 - Equipment and instruments bids evaluation.
 
Piper Energy Inc. Two Hills Gas Gathering System
- Engineering disciplines coordination.
 - Equipment evaluation.
 - AEUB permits.
 
Sherritt International Canasí/Yumurí Salt Water Injection (Cuba)
- Equipment evaluation.
 - Equipment and instruments bids evaluation.
 - Project control.
 
Sherritt International Yumurí Oil Battery Expansion (Cuba)
- Equipment evaluation.
 - Equipment and instruments bids evaluation.
 - Equipment evaluation.
 
Husky Oil North Gull Lake Oil Battery Upgrade Project, (Swift Current, SK)
- Plant commissioning/start-up.
 - DBM and bidding documents preparation.
 - Disciplines coordination.
 
HATCH Energy. Calgary, AB, Canada, Project Engineer, 2006 - 2007
Oil and Gas Engineering Projects-Coordination and Management
INCO Ltd. H2S Vaporizers Replacement
- Schedule and budget preparation.
 - Equipment evaluation.
 
BD Proposals Technical Support for:
- NCO Ltd. H2S vaporizers replacement.
 - Shell Canada CO2 recovery.
 - ARC Resources Pembina SAGD.
 
Enhance Energy Ltd. Rowley 11-32 Battery Expansion
- Equipment evaluation.
 - Execution plan preparation.
 - Project control-project management.
 
AltaGas Enhanced Ethane Recovery
- Equipment evaluation.
 - Equipment and instruments evaluation.
 - Disciplines coordination.
 
Gas Liquids Engineering Inc., Calgary, AB, Canada, Project Engineer , 2003 - 2004
Oil and Gas Engineering Projects-Coordination and Management
Mazeppa Gas Plant & Pipelines (High River, AB)
- Bidding package preparation.
 - Evaluation of tenders by bidders.
 - Engineering drawings review.
 
Wolf Lake Gas Plant
- Bidding package preparation.
 - Evaluation of tenders by bidders.
 - Engineering review.
 
Project Management/Coordination assignments:
- Bidding package preparation.
 - Engineering calculations.
 - AEUB permits.
 
Honors & Publications
Credentials
Additioanl Courses-Training
- Business Plan
 - Business Basics
 - Projects Contract Legal Issues
 - Understanding Leadership
 - Risk and Loss Management
 - Engineering Economics
 - Construction Estimating
 - Energy Project Efficiency
 - Flaring Principles & Practices
 - Project Management
 - Petroleum Management
 - Heavy Oil Treatment
 - Risk and Loss Management
 - Mathematical Modelling
 - Higher Modern Mathematics
 - Multivariate Statistical Analysis
 - Environmental Pollution
 - Dynamical Optimization
 - Computer programs: Excel, MS Word, Power Point, MS Project and AutoCAD.
 
Languages
- Spanish-Native
 - English-Second Language
 
Academic and Professional Affiliations
- American Institute of Chemical Engineers (AIChE)
 - Sociedad Meteorológica de Cuba (SOMETCUBA)
 - American Mathematical Society (AMS)
 
Education
- B.S. Engineering, Chemical Process, University of Matanzas, Matanzas, Cuba
 