CQV (Commissioning, Qualification, Verification) Pharmaceutical Consultant
Technical Consultant #2319
Expertise
- Pharmaceutical standards regulations: BPF, BPL, GMP, Europ%uFFFFe Pharmacop%uFFFF and FDA 21CFR part.11.
 - Quality assurance and the standards regulations requirements for the pharmaceutical industry.
 
Methodology
- Risk Analysis (AMDEC, HACCP)
 - Six Sigma
 
Technical Execution
- Pharmaceutical quality assurance and the standards regulations requirements.
 - Design, quality, commissioning and qualification documentation of pharmaceutical processes.
 - FAT, (Factory Acceptance Testing),SAT, (Site Acceptance Testing) commissioning, (re)qualification and validation tests.
 - Aseptic processing: Filling line (washer, tunnel, filling machine, isolators, CIP (Clean-In-Place and SIP (Sterilization-In-Place, magazine handling unit, Tank TCM-Temperature control module), isolator conventional and non- conventional, sterilizers, lyophilizer, SIP and CIP systems.
 - Equipment: Packaging equipment including bar code vision systems and labelers,
 - Laboratory systems: stability chambers, cold rooms, particle counters, filter integrity testers, microbial identification units, heat sealer, precision weighing, LIMS and HPLC.
 - Utilities: WFI and purified water systems, HVAC, compressed air and inert gases, clean steam, nitrogen, and DCM networks.
 
Pharmaceutical Equipment
- Washer
 - Tunnel
 - Filling machine
 - Isolators
 - Magazine handling Unit
 - Labeling machine
 - Heat sealer
 - Autoclave
 - Containers for isolators, RTP and Hoover
 - Lyophilizer
 - HVAC equipment
 - Heat exchanger
 - Tanks
 
Experience
Undisclosed Company, Consultant-Qualification Engineer, 2014 - Present
Project-CGV3. (Global Project, English Documentation). Qualification: Filling line; washer, tunnel, filling machine, isolator and CIP/SIP, magazine handling unit, tank, temperature control module.
- Installation Qualification Leader: Managing a team performing numerous functions.
 - Documentation of the IQ protocol.
 - Static test execution.
 - Review and presentation of the raw data.
 - Documentation of the SAT report.
 - Corrections of the discrepancies.
 - Operational qualifications tests executions for the magazine handling unit.
 - Operational qualification tests of the line (alarms tests, functional sequences, HSE tests, performances tests.
 
Site Acceptance Tests - SAT
- Documentation of the SAT protocol.
 - Static and dynamic test execution.
 - Review and presentation of the raw data.
 - Documentation of the SAT report.
 
Factory Acceptance Tests (Bosch Plant in Germany) SAT
- Documentation of the FAT protocol.
 - Static and dynamic test execution.
 - Review and presentation of the raw data.
 - Documentation of the FAT report.
 
Design
- Update of the design documentation (user requirements UR, software requirements user SWR, commissioning and qualification work plan CQWP, Description of the system DSP, Classification CLA).
 
Washer (Design)
- Review of the P&ID.
 - Update of the design documentation (UR, SWR, CQWP).
 
Sterile Container
- Documentation of the FAT protocol.
 - Static and dynamic test execution.
 - Modification of the design of the container after check in site.
 - Review and presentation of the raw data.
 - Documentation of the FAT report.
 
Ipsen Pharmaceutical, Signes, France, Qualification and Validation, 2013
Liophilizer
- Validation of a new Liophilizer recipe.
 - Modification of the Liophilizer pressure probes.
 - Modification of the sequencing of the Liophilizer valves.
 - Documentation of the IQ an OQ protocols.
 - Planning and testing.
 - Documentation of the IQ and OQ reports.
 
Labeler Marchesini - SAT/QI/QO
- Documentation of the IQ an OQ Protocols.
 - Planning and testing (SAT, IQ, OQ).
 - Documentation of the IQ and OQ reports.
 
Heater Sealer
- Set-up (Determination of the temperature coefficient).
 - Documentation of the IQ an OQ Protocols.
 - Planning and testing (SAT, IQ, OQ).
 - Documentation of the IQ and OQ reports.
 
Oven
- Documentation of the IQ an OQ Protocols.
 - Planning and testing (SAT, IQ, OQ).
 - Documentation of the IQ and OQ reports.
 
Network Utilities (Nitrogen, Alcohol and DCM)
- Documentation of the IQ an OQ Protocols.
 - Planning and testing (SAT, IQ, OQ).
 - Documentation of the IQ and OQ reports.
 
Sanofi, Le Trait, France, Consultant - Qualification Engineer, 2013
Isolator not conventional (RABS configuration)
- Aeraulic qualification (smoke test).
 
Isolator Conventional
- Aeraulic qualification (smoke test).
 - Particulate mapping.
 
Geurbet, Aulnay Sous Bois, France, Consultant Engineer, 2012 - 2013
Project: CD1-Qualification and Validation - HVAC and Local
- Planning and testing, SAT, IQ, OQ.
 - Documentation of the IQ and OQ reports.
 
Research and Development Technician, 2009
Autoclave Fedegari
- Documentation of the Qualification Performance Protocol (PQP).
 - Development of a new recipe (new load).
 
Depyrogenation Oven Fedegari
- Documentation of the PQP.
 - Determination of the worst case load.
 
Washing Machine HAMO
- Documentation of the Operational Qualification Protocol.
 - Development of a specific test 'effectiveness of chemical removal.'
 - Validation of a new analysys method for the 'effectiveness of chemical removal test.'
 
Network Azote Balances (Mettler) and Heat exchanger
- Update of the OQP.
 - Planning and testing.
 - Documentation of the report.
 
Balances (Mettler)
- Update of the OQP.
 - Planning and testing.
 - Documentation of the OQ report.
 
Heat Exchanger
- Documentation of the IQ and OQ Protocol.
 - Planning and testing.
 
Industrial Development
- Support for the Technical and clinical batch production.
 - Updates of the SOP.
 - Risks analisys.
 
Catalent, Beinheim, France, Consultant, Qualification Engineer, 2012
Project: Siemens (Network Chilled Water Utilities Automates) Qualification and Validation
- Performed chilled water utilities automates through IFIX 5.0.
 - Documentation of the FAT and SAT protocols.
 - Planning and FAT (Actemium at Strasbourg) and SAT testing.
 - Documentation of the FAT and SAT report.
 
LFB,Les Ulis, France, Consultant, Qualification Engineer, 2011 - 2012
Project: ADEAE-Qualification and Validation - Tanks (14 units)
- Documentation of the SAT, IQ an OQ protocols.
 - Planning and testing (SAT, IQ, OQ).
 - Documentation of the IQ and OQ reports.
 
Autoclave
- Validation of a new autoclave load.
 - Documentation of the OQ Protocol.
 - Planning and testing.
 - Documentation of the OQ report.
 
Stallergene, Antony, France, Research and Development Technician, 2011
VSI (Excel files validation)
- Planning and testing.
 - Update of the Excel files.
 - Documentation of the IQ and OQ reports.
 
Le Moulin De Corberl, Biologist and Microbiologist Technician, 2009
- Quality control (Dosage, spectophotometry).
 - Reception, samples management.
 
Sonofi Winthrop Industrie, Maison Alfort, France, Biologist - Microbiologist Technician, 2007 - 2008
- HVAC Validation (aseptic filling.)
 - Quality control (weighing, penicillin analysis, bacteria enumeration, microbiological sampling).
 - Documentation of the SOP.
 
CIS-BIO International, Cea Saclay, France, Biologist Technician, 2007
Research and Development Technician
- Quality control, weighing, microbiological sampling, filters WIT.
 
Inserm, Paris France, Biologist and Microbiologist Technician, 2005 - 2006
- Study on a Human enzyme (enzyme induction, ELISA method, bacteria enumeration.
 
Honors & Publications
Languages
- French: First language
 - English: Good proficient in English (spoken and written)
 - Thai: Basic speaking skills (continued education at RTL school and AUA language center at Bangkok)
 - Spanish: Proficient
 
Education
- B.S. Biochemistry (ESTBA Technical College, Paris, France)
 - B.S. Laboratory Science (St LEON College, Corbeil Essonne, Lie, France)
 
