Consultant for Power Plant Project Management

Technical Consultant #1456


Expertise

Fossil Fuel and Combustion Turbine Power Plants:

  • Construction Project Management: Over thirty years experience in engineering, construction, facility maintenance and project management.
  • Engineering Project Management: Power Plants, coal, oil, gas, combustion turbines and site work foundations.
  • Construction of refinery tanks, distillation columns, pressure vessels, piping, sewage treatment plants, wet land mitigation and water front construction.
  • Strong background in organization and human development.

Experience

Connective Power, Project Manager, 1998 - 2006

  • Managed projects from concept definition to commercial start up. Projects included: Tanks and vessels, underground fuel oil piping replacement, cooling towers and heat exchangers.
  • Construction of fossil fuel and combustion turbine facilities capital projects.
  • Bethlehem Power Plant Combustion Turbine Project (1,100 MW). Managed the civil and mechanical engineering design work and civil site preparation work.
  • Member of the Hayroad 5-8 Combustion Turbine Project (550 MW), with three turbines going into simple cycle operation on schedule.
  • Member of the re-powering Project team for Motiva at Delaware City, responsible for proposal preparation, estimating, managed project design and field installation ($15 million project).

Atlantic Electric Company, Project Manager, 1987 - 1997

  • Fossil fuel and combustion turbine facilities capital projects.
  • Project responsibility from concept definition through commercial start up.
  • Project included FGD work, stacker, conveyor systems, unit re-powering, fuel handling, coal pile runoff, sewage treatment plant, site plans, wet land mitigation, water front construction and buildings.
  • Consultant to a group of 14 engineers in mechanical, tank/vessels, structural, civil, rigging and commercial areas.

Chicago Bridge & Iron Co., Project Manager, 1979 - 1987

  • Managed multi-million dollar contracts for petroleum, chemical and power industries, from initial planning to final erection, work included; turnkey operations, turnarounds, repairs, modifications, retrofits and maintenance.
  • Project expenditures averaging 140,000 field man hours per year with completion on schedule with average savings of 18%.
  • Directly managed field construction crews of up to 210 people.
  • Innovative, practical manager skilled in getting the best performance from his people.
  • Reorganized regional construction office and increased productivity by 35% with a reduced labor force.
  • Managed a 500,000 man hour per year, multi-craft plant maintenance contract.

Engineering Supervisor/Design Engineer, 1966 - 1979

  • Managed a group of engineers, designers and drafters, in the design and preparation of drawings, for fabrication and erection of plate structures, site work, foundations, piping and mechanical equipment.
  • Handled a total of 304 contracts.
  • Developed new standard drawings, designs and procedures for company wide use.
  • Prepared design, design reviews and procedures for fabrication and erection of tanks, vessels, foundations and piping.

Honors & Publications

Credentials

  • Professional Engineer in New Jersey, Illinois, Maryland and New York
  • Fellow, American Society of Civil Engineers

Education

  • M.S., Wilmington College, Wilmington, DE
  • B.S., University of Maine, Orono, ME
Save Resume #1456
to Contact Form?

You must first click "Yes" to save this resume

Submit Request

You have no Saved Resumes

Add resumes within our various Ares of Expertise by clicking "Add Resume(s)" below.

Add Resume(s)